IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
10905
Downloads
651
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 241
Invalid: 845
Minimum: -9
Maximum: 730
Type: Discrete
Decimal: 0
Start: 894
End: 896
Width: 3
Range: -9 - 730
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 9
3.7%
-6 Still in process 64
26.6%
-5 Application denied 11
4.6%
1 One day or less 10
4.1%
2 1
0.4%
4 2
0.8%
5 2
0.8%
7 2
0.8%
9 1
0.4%
10 9
3.7%
12 1
0.4%
14 1
0.4%
15 5
2.1%
20 11
4.6%
30 37
15.4%
37 1
0.4%
40 3
1.2%
45 2
0.8%
50 1
0.4%
60 14
5.8%
70 2
0.8%
90 12
5%
100 4
1.7%
120 4
1.7%
132 1
0.4%
150 2
0.8%
180 4
1.7%
200 1
0.4%
240 1
0.4%
250 1
0.4%
270 1
0.4%
300 2
0.8%
360 1
0.4%
365 12
5%
400 3
1.2%
700 1
0.4%
730 2
0.8%
Sysmiss 845
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.