IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
10985
Downloads
651
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 172
Invalid: 914
Minimum: -9
Maximum: 360
Type: Discrete
Decimal: 0
Start: 545
End: 547
Width: 3
Range: -9 - 360
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 13
7.6%
-6 Still in process 30
17.4%
-5 Application denied 3
1.7%
1 One day or less 24
14%
2 4
2.3%
3 5
2.9%
4 2
1.2%
5 6
3.5%
7 12
7%
10 9
5.2%
14 6
3.5%
15 4
2.3%
20 4
2.3%
30 29
16.9%
40 1
0.6%
60 7
4.1%
90 8
4.7%
120 1
0.6%
150 2
1.2%
200 1
0.6%
360 1
0.6%
Sysmiss 914
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.