IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
10967
Downloads
651
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

Application To Obtain An Electrical Connection Submitted Over The Last 2 Years (c3)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 1086
Invalid: -
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 541
End: 542
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Question pretext
READ THE FOLLOWING TO THE RESPONDENT BEFORE PROCEEDING:
Now, we turn to the establishment’s operations
Literal question
Over the last two years, did this establishment submit an application to obtain an electrical connection?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
0.1%
1 Yes 172
15.8%
2 No 913
84.1%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Question post text
- No, GO TO C.6
- DON’T KNOW (SPONTANEOUS), GO TO C.6
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.