IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
11013
Downloads
651
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 106
Invalid: 980
Minimum: -9
Maximum: 365
Type: Discrete
Decimal: 0
Start: 528
End: 530
Width: 3
Range: -9 - 365
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 11
10.4%
-6 Still in process 12
11.3%
-5 Application denied 1
0.9%
1 One day or less 15
14.2%
2 4
3.8%
3 5
4.7%
4 3
2.8%
5 6
5.7%
7 12
11.3%
8 1
0.9%
10 9
8.5%
12 1
0.9%
15 5
4.7%
16 1
0.9%
20 3
2.8%
25 1
0.9%
30 7
6.6%
50 1
0.9%
60 1
0.9%
90 5
4.7%
240 1
0.9%
365 1
0.9%
Sysmiss 980
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.