IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
11336
Downloads
667
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

Over Last 3 Years, Was Max. Payback Time vs. Non-Energy Efficiency Measures (_2019_BMGc29)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 62
Invalid: 1024
Minimum: -9
Maximum: 3
Type: Discrete
Decimal: 0
Start: 3102
End: 3103
Width: 2
Range: -9 - 3
Format: Numeric

Questions and instructions

Literal question
Over the last three years, was this maximum payback time longer than, equal to, or shorter than the average one applied to non-energy efficiency related measures?
Categories
Value Category Cases
-9 Don't Know (Spontaneous) 3
4.8%
1 Longer 36
58.1%
2 Equal 14
22.6%
3 Shorter 9
14.5%
Sysmiss 1024
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.