IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MKD_2009-2019_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2019, Panel Data

North Macedonia, 2008 - 2019
Get Microdata
Reference ID
MKD_2009-2019_ES-P_v01_M
Producer(s)
The World Bank Group, The European Bank for Reconstruction and Development, The European Investment Bank
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
11117
Downloads
654
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • North
    Macedonia_2009_2013_2019.dta

Average Duration of Power Outages: Minutes (_2019_c8b)

Data file: North Macedonia_2009_2013_2019.dta

Overview

Valid: 98
Invalid: 988
Minimum: -9
Maximum: 59
Type: Discrete
Decimal: 0
Start: 1745
End: 1746
Width: 2
Range: -9 - 59
Format: Numeric

Questions and instructions

Literal question
How long did these power outages last on average?
- Minutes
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
5.1%
0 46
46.9%
3 1
1%
5 2
2%
10 4
4.1%
15 4
4.1%
20 2
2%
25 1
1%
30 25
25.5%
35 1
1%
40 1
1%
50 3
3.1%
59 3
3.1%
Sysmiss 988
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.