IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MDG_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Madagascar, 2013 - 2014
Get Microdata
Reference ID
MDG_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 22, 2014
Last modified
Mar 29, 2019
Page views
18426
Downloads
1194
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • madagascar_2013_full_data

Wait for water connection (c13)

Data file: madagascar_2013_full_data

Overview

Valid: 29
Invalid: 503
Type: Discrete
Decimal: 0
Start: 266
End: 269
Width: 4
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
-6
7
10
12
15
24
30
45
60
90
100
180
365
540
1095
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.