IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / DJI_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Djibouti, 2013
Get Microdata
Reference ID
DJI_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
12646
Downloads
1563
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Djibouti-2013-full
    data

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: Djibouti-2013-full data

Overview

Valid: 17
Invalid: 249
Type: Discrete
Decimal: 0
Start: 216
End: 217
Width: 2
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 Don't know (SPONTANEOUS)
1 LESS THAN ONE HOUR
2
4
5
6
8
12
15
18
24
72
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.