IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_1983_PODES_V01_M / variable [F1]
central

Village Potential Survey 1983

Indonesia, 1983
Reference ID
IDN_1983_PODES_v01_M
Producer(s)
Central Bureau of Statistics
Metadata
DDI/XML JSON
Created on
Feb 19, 2014
Last modified
Mar 29, 2019
Page views
19754
Downloads
606
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • podes83a

Type of construction 5 (b22_2b52)

Data file: podes83a

Overview

Valid: 321
Invalid: 0
Type: Discrete
Start: 1213
End: 1214
Width: 2
Format:

Questions and instructions

Literal question
If ‘yes : b. Not yet completed : Type of construction 5
Categories
Value Category
01
02
04
05
06
07
08
11
12
14
15
16
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Description

Definition
If there is physical development in fiscal year 1982-1983 (detail 1 coded 1), then write a description of the development of differentiated between the already and the not yet finished.
b. Unfinished construction;
Only asked for developments that are managed by rural / urban.
columns 2 & 3: Same as point 'a'
column 4: Fill in the length done (which is already implemented) for each type of development
column 5: Fill in the percentage of buildings that have been completed. Stuffing in integers.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.