IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12360
Downloads
673
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

What Were Managers' Performance Bonuses Usually Based On? (_2013_2019_BMr9)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 285
Invalid: 1710
Minimum: -9
Maximum: 4
Type: Discrete
Decimal: 0
Start: 1483
End: 1484
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Literal question
Over the last complete fiscal year [Insert last complete fiscal year], what were managers' performance bonuses mostly based on?
Categories
Value Category Cases
-9 Don't know (spontaneous) 5
1.8%
-7 15
5.3%
1 Their own performance 99
34.7%
2 Their team's performance 40
14%
3 The establishment’s performance 120
42.1%
4 The firm’s performance 6
2.1%
Sysmiss 1710
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ OUT

IF THE ESTABLISHMENT IS NOT PART OF A MULTI-ESTABLISHMENT FIRM (A7 IS NO), THEN DO NOT USE OPTION 4
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.