IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12346
Downloads
673
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

How Much of An Obstacle: Corruption (j30f)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 1995
Invalid: -
Minimum: -9
Maximum: 4
Type: Discrete
Decimal: 0
Start: 923
End: 924
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 30
Literal question
Using the response options on the card; To what degree are each of the following an obstacle to the current operations of this establishment?
- Corruption
Categories
Value Category Cases
-9 Don't know (spontaneous) 50
2.5%
-7 Does not apply 69
3.5%
0 No obstacle 1444
72.4%
1 Minor obstacle 113
5.7%
2 Moderate obstacle 116
5.8%
3 Major obstacle 135
6.8%
4 Very severe obstacle 68
3.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ OUT OPTIONS
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.