IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12294
Downloads
673
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

Informal Gift/Payment Expected or Requested For A Construction-Related Permit (g4)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 404
Invalid: 1591
Minimum: -9
Maximum: 2
Type: Discrete
Decimal: 0
Start: 835
End: 836
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know (spontaneous) 20
5%
-8 Refusal (spontaneous) 6
1.5%
1 Yes 22
5.4%
2 No 356
88.1%
Sysmiss 1591
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
ASK THE FOLLOWING QUESTION ONLY FOR RETAIL ESTABLISHMENTS. OTHERWISE GO TO G.30
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.