IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12293
Downloads
673
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 280
Invalid: 1715
Minimum: -9
Maximum: 300
Type: Discrete
Decimal: 0
Start: 558
End: 560
Width: 3
Range: -9 - 300
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 11
3.9%
-6 Still in process 11
3.9%
-5 Application denied 3
1.1%
1 One day or less 60
21.4%
2 16
5.7%
3 42
15%
4 4
1.4%
5 14
5%
7 24
8.6%
9 1
0.4%
10 39
13.9%
11 1
0.4%
12 1
0.4%
14 3
1.1%
15 16
5.7%
20 5
1.8%
25 1
0.4%
30 15
5.4%
60 6
2.1%
90 5
1.8%
120 1
0.4%
300 1
0.4%
Sysmiss 1715
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.