IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12654
Downloads
688
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

Way of intro of main new/significantly improved production/delivery met (_2013_ECAo11x)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 1995
Invalid: -
Type: Discrete
Start: 3745
End: 3745
Width: 1
Range: -
Format: character

Questions and instructions

Question pretext
SHOW CARD 103
Literal question
Which of the following best describes the way in which this establishment introduced or developed the main new or significantly improved method of supplying products or services?
Categories
Value Category Cases
1995
100%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
ONLY ONE ANSWER
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.