IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12770
Downloads
688
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

More sophisticated projects (_2013_ECAr17c)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 70
Invalid: 1925
Minimum: 1
Maximum: 2
Type: Discrete
Decimal: 0
Start: 3366
End: 3367
Width: 2
Range: 1 - 2
Format: Numeric

Questions and instructions

Literal question
What kind of consulting services were provided?
- More sophisticated projects (restructuring,
feasibility study, environmental
management and energy efficiency)
Categories
Value Category Cases
-9 Don't know 0
0%
-8 Refused 0
0%
-7 DOES NOT APPLY 0
0%
1 Yes 10
14.3%
2 No 60
85.7%
Sysmiss 1925
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
READ EACH OPTION ALOUD
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.