IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UZB_2008-2019_ES-P_V01_M / variable [F2]
central

Enterprise Survey 2008-2019, Panel Data

Uzbekistan, 2008 - 2019
Get Microdata
Reference ID
UZB_2008-2019_ES-P_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD)
Metadata
DDI/XML JSON
Created on
Jan 19, 2021
Last modified
Jan 19, 2021
Page views
12717
Downloads
688
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Uzbekistan_2008_2013_2019.dta

For The Next 3 Years, Which Public Spending Should Be of Highest Priority? (_2019_BMj5)

Data file: Uzbekistan_2008_2013_2019.dta

Overview

Valid: 1239
Invalid: 756
Minimum: -9
Maximum: 7
Type: Discrete
Decimal: 0
Start: 2657
End: 2658
Width: 2
Range: -9 - 7
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD 31
Literal question
From the perspective of this establishment, for the next three years, which one of the following areas of public spending should be the highest priority?
Categories
Value Category Cases
-9 Don't know (spontaneous) 49
4%
1 Transport 186
15%
2 Energy 361
29.1%
3 Environment 50
4%
4 Education 202
16.3%
5 Health 110
8.9%
6 Information and Communication Technology 220
17.8%
7 Other (spontaneous-specify) 61
4.9%
Sysmiss 756
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.