IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GRC_2018_ES_V01_M / variable [F2]
central

Enterprise Survey 2018

Greece, 2018 - 2019
Get Microdata
Reference ID
GRC_2018_ES_v01_M
Producer(s)
World Bank Group (WBG), European Bank for Reconstruction and Development (EBRD), European Investment Bank (EIB)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
8028
Downloads
150
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • greece_2018_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: greece_2018_full_data

Overview

Valid: 12
Invalid: 588
Type: Discrete
Decimal: 0
Start: 281
End: 282
Width: 2
Range: -9 - 22
Format: Numeric

Questions and instructions

Literal question
C.13 In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 1
8.3%
-6 Still in process 2
16.7%
-5 Application denied 1
8.3%
1 One day or less 1
8.3%
3 1
8.3%
5 1
8.3%
10 2
16.7%
15 2
16.7%
22 1
8.3%
Sysmiss 588
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.