IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PER_2006-2017_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2006-2017, Panel data

Peru, 2006 - 2017
Get Microdata
Reference ID
PER_2006-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
13182
Downloads
782
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Peru_2006_2010_2017

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Peru_2006_2010_2017

Overview

Valid: 646
Invalid: 1989
Minimum: -9
Maximum: 1460
Type: Discrete
Decimal: 0
Start: 611
End: 614
Width: 4
Range: -9 - 1460
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category Cases
-9 Don't know (spontaneous) 39
6%
-6 Still in process 76
11.8%
-5 Application denied 3
0.5%
1 One day or less 1
0.2%
2 5
0.8%
3 4
0.6%
4 3
0.5%
5 3
0.5%
6 3
0.5%
7 21
3.3%
8 2
0.3%
10 10
1.5%
12 1
0.2%
14 6
0.9%
15 33
5.1%
20 16
2.5%
21 3
0.5%
25 2
0.3%
30 95
14.7%
35 1
0.2%
40 7
1.1%
45 11
1.7%
50 3
0.5%
60 72
11.1%
70 2
0.3%
75 1
0.2%
80 1
0.2%
90 76
11.8%
105 1
0.2%
120 27
4.2%
150 9
1.4%
180 56
8.7%
240 10
1.5%
270 1
0.2%
290 1
0.2%
300 3
0.5%
360 3
0.5%
365 26
4%
400 1
0.2%
425 1
0.2%
540 1
0.2%
547 1
0.2%
720 2
0.3%
730 2
0.3%
1460 1
0.2%
Sysmiss 1989
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.