IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PER_2006-2017_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2006-2017, Panel data

Peru, 2006 - 2017
Get Microdata
Reference ID
PER_2006-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
13307
Downloads
782
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Peru_2006_2010_2017

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Peru_2006_2010_2017

Overview

Valid: 193
Invalid: 2442
Minimum: -9
Maximum: 1460
Type: Discrete
Decimal: 0
Start: 364
End: 367
Width: 4
Range: -9 - 1460
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 11
5.7%
-6 Still in process 35
18.1%
-5 Application denied 4
2.1%
1 One minute or less 2
1%
2 3
1.6%
3 1
0.5%
4 1
0.5%
5 2
1%
6 1
0.5%
7 13
6.7%
8 2
1%
10 2
1%
14 2
1%
15 9
4.7%
20 8
4.1%
21 3
1.6%
30 24
12.4%
36 1
0.5%
40 2
1%
45 4
2.1%
50 1
0.5%
60 18
9.3%
73 1
0.5%
90 20
10.4%
120 5
2.6%
150 1
0.5%
180 8
4.1%
240 2
1%
365 3
1.6%
720 1
0.5%
730 2
1%
1460 1
0.5%
Sysmiss 2442
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for a water connection: period in days between when the application was completed and submitted until the connection was provided.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.