IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / URY_2010_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2010

Uruguay, 2010
Get Microdata
Reference ID
URY_2010_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
20135
Downloads
1200
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Uruguay-2010-full
    data-

Other Cost Of Production (n2j)

Data file: Uruguay-2010-full data-

Overview

Valid: 360
Invalid: 247
Type: Discrete
Decimal: 0
Start: 853
End: 862
Width: 10
Range: -
Format:

Questions and instructions

Question pretext
SHOW CARD
READ OUT
Literal question
For fiscal year [insert last complete fiscal year], please provide the following information about this establishment:
Other cost of production not included above
Categories
Value Category
-9 Don’t know
0
6912
10000
11350
15000
20000
23870
30000
36000
46290
48000
50000
54000
54555
60000
64542
67800
80000
100000
120000
144000
150000
200000
220000
221469
243659
250000
290000
300000
400000
405000
438826
445000
500000
600000
625522
654233
800000
900000
988696
1000000
1140531
1270603
1421270
1515472
1600000
1640000
1800000
1900000
1980000
2000000
2075000
2990499
3000000
3230000
3390000
3600000
3775458
4000000
4830000
4837977
4900000
4912700
5000000
5362000
6000000
6239000
6534328
7000000
8400000
8700000
8989481
11000000
12000000
12900000
13891080
14000000
15000000
17000000
18000000
18239326
19000000
19212203
20000000
22837189
25000000
25633000
26000000
28500000
29891917
33652000
38501000
39000000
47000000
49000000
50000000
50593792
55350156
71030646
81000000
100000000
120000000
130000000
178025907
185840000
200000000
244895700
388000000
1970300000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance). Raw materials and intermediate goods: (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements. Finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold. This is usually an item directly taken from the financial statements. Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment. Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, forklifts, or other motor vehicles associated with the establishment. Other costs of production not included above: (M) this should be computed as total costs of production minus the items included above.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.