IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUR_2008_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2008

Turkiye, 2008
Get Microdata
Reference ID
TUR_2008_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Jun 14, 2022
Page views
12638
Downloads
1068
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Turkey-2008--full
    data-

when you applied for a water connection, was an informal gift requested? (c14)

Data file: Turkey-2008--full data-

Overview

Valid: 116
Invalid: 1036
Type: Discrete
Decimal: 0
Start: 324
End: 325
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category
-9 don't know
-8 refusal
1 yes
2 no
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.