IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SCG_2002_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2002

Serbia and Montenegro, 2002
Get Microdata
Reference ID
SCG_2002_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
15176
Downloads
217
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Serbia and
    Montenegro-2002--full
    data-5

% sales price exceeds operating costs (q23)

Data file: Serbia and Montenegro-2002--full data-5

Overview

Valid: 214
Invalid: 36
Minimum: 3
Maximum: 50
Mean: 17.893
Standard deviation: 9.717
Type: Discrete
Decimal: 0
Start: 168
End: 169
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Considering your main product line or main line of services in the domestic market, by what margin does your sales price exceed your operating costs (i.e., the cost material inputs plus wage costs but not overheads and depreciation)
Categories
Value Category
3
4
5
7
8
9
10
11
12
14
15
17
20
22
25
30
35
40
50
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.