IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NER_2005-2017_ES-P_V01_M / variable [F3]
central

Enterprise Survey 2005-2009-2017

Niger, 2005 - 2017
Get Microdata
Reference ID
NER_2005-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
13222
Downloads
762
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • niger_2005_2009_2017

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: niger_2005_2009_2017

Overview

Valid: 42
Invalid: 397
Minimum: -9
Maximum: 90
Type: Discrete
Decimal: 0
Start: 228
End: 229
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
5
6
7
10
14
15
30
40
48
60
65
75
90
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.