IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ROU_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Romania, 2008
Get Microdata
Reference ID
ROU_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
14213
Downloads
951
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Romania-2009--full
    data-

total annual costs of water in last fiscal year (n2h)

Data file: Romania-2009--full data-

Overview

Valid: 193
Invalid: 348
Type: Discrete
Decimal: 0
Start: 979
End: 984
Width: 6
Range: -
Format:

Questions and instructions

Literal question
For fiscal year 2007, please provide the following information about this establishment:
Total annual costs of water
Categories
Value Category
-9 don't know
0
60
132
150
200
300
360
400
500
600
700
722
739
800
811
1000
1200
1360
1400
1500
1800
1850
1896
2000
2146
2200
2291
2300
2400
2500
2683
3000
3900
4200
4445
4520
4800
4876
5000
5672
5948
6000
6300
6400
6631
7000
7236
7500
7560
7895
8048
8400
9800
10000
12000
13200
14160
14385
15000
16753
17526
20000
20866
21600
23010
23842
25045
26000
26300
29342
30000
31410
40000
42000
49375
50000
60000
65000
72000
80000
84895
85723
89500
93000
101167
120000
157417
200000
216143
400000
476390
481810
707999
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.