IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LBR_2009-2017_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2017

Liberia, 2009 - 2017
Get Microdata
Reference ID
LBR_2009-2017_ES-P_v01_M
Producer(s)
World Bank, Liberia Institute for Statistics and Geo-Information Services
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
8728
Downloads
514
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Liberia_2009_2017

Cost For Establishment to Re-Purchase All of Its Machinery (_2017_n7a)

Data file: Liberia_2009_2017

Overview

Valid: 0
Invalid: 0
Type: Discrete
Decimal: 0
Start: 2062
End: 2071
Width: 10
Range: -
Format:

Questions and instructions

Literal question
Hypothetically, if this establishment were to purchase the assets it uses now, in their current condition and regardless of whether the establishment owns them or not, how much would they cost, independently of whether they are owned, rented or leased- Machinery, vehicles, and equipment.
Categories
Value Category
-9 Don't know (spontaneous)
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.