IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PRY_2006-2017_ES-P_V01_M / variable [F4]
central

Enterprise Survey 2006-2010-2017

Paraguay, 2006 - 2017
Get Microdata
Reference ID
PRY_2006-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
10235
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • paraguay_2006_2010_2017

Total Annual Costs Of Electricity In Last Fiscal Year (n2b)

Data file: paraguay_2006_2010_2017

Overview

Valid: 1160
Invalid: 178
Type: Discrete
Decimal: 0
Start: 877
End: 886
Width: 10
Range: -
Format:

Questions and instructions

Question pretext
SHOW CARD
READ OUT
Literal question
For fiscal year [insert last complete fiscal year], please provide the following information about this establishment:
- Total annual costs of electricity
Categories
Value Category
-9 Don't know (spontaneous)
-8
0
3000
500000
600000
720000
750000
1000000
1200000
1250000
1300000
1400000
1500000
1600000
1650000
1800000
2000000
2200000
2345000
2400000
2500000
2700000
2800000
3000000
3240000
3300000
3500000
3572000
3600000
3800000
3900000
4000000
4100000
4200000
4500000
4800000
4850000
4950000
5000000
5086288
5400000
6000000
6300000
6500000
6600000
6660000
7000000
7200000
7500000
7920000
8000000
8250275
8400000
8500000
8640000
8808786
9000000
9200000
9400000
9600000
9900000
10000000
10800000
11000000
11340000
11900000
12000000
12006000
12340936
12500000
13000000
13064606
13200000
13750000
14000000
14400000
14500000
14850000
14996807
15000000
15039093
15116673
15600000
15700000
15960003
16000000
16200000
16800000
17000000
18000000
19000000
19440000
19500000
20000000
20400000
20500000
21300000
22000000
23000000
24000000
25000000
27750000
27840944
27900000
28561000
29500000
30000000
30690011
32000000
32400000
34000000
34635000
35000000
35784000
36000000
38000000
38400000
38500000
40000000
42000000
42452345
44693412
45000000
48000000
49000000
49200000
49273000
50000000
54000000
55000000
55500000
60000000
65000000
66000000
70000000
72000000
73000000
78000000
80000000
82000000
84000000
86000000
87031743
90000000
90720000
92308572
95000000
96000000
97000000
100000000
102000000
104951000
105000000
110000000
111497480
115000000
115548000
120000000
126000000
130000000
138750000
139000000
140000000
150000000
160000000
166000000
169641000
170000000
174900000
175000000
180000000
183716635
190000000
192000000
193333333
194000000
194250000
200000000
210000000
214000000
214500000
216000000
217500000
220000000
222500000
226153737
227000000
230000000
236000000
240000000
250000000
254620000
268850000
270000000
276000000
277500000
300000000
305700000
310000000
320000000
330000000
333000000
340000000
350000000
360000000
373000000
390000000
393000000
399458682
400000000
406255261
420000000
430000000
458000000
462681000
470000000
473377697
479000000
480000000
490000000
500000000
510000000
511000000
516000000
540000000
550000000
555000000
556521000
560000000
594000000
594180000
600000000
650000000
660000000
700000000
728940135
750000000
780000000
790000000
792000000
800000000
840000000
890750000
900000000
1000000000
1100000000
1129000000
1134000000
1200000000
1212300000
1280221477
1300000000
1440000000
1500000000
1625000000
1677000000
1800000000
1950000000
2000000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance). Raw materials and intermediate goods: (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements. Finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold. This is usually an item directly taken from the financial statements. Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment. Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, forklifts, or other motor vehicles associated with the establishment. Other costs of production not included above: (M) this should be computed as total costs of production minus the items included above.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.