IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2009-2017_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2017

Sierra Leone, 2008 - 2017
Get Microdata
Reference ID
SLE_2009-2017_ES-P_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
5395
Downloads
396
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Sierra
    Leone_2009_2017

How Many Days Did It Take For You to Obtain A Water Connection? (c13)

Data file: Sierra Leone_2009_2017

Overview

Valid: 37
Invalid: 265
Type: Discrete
Decimal: 0
Start: 251
End: 253
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
4
5
6
7
8
9
10
12
13
21
24
30
120
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.