IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLE_2009-2017_ES-P_V01_M / variable [F1]
central

Enterprise Survey 2009-2017

Sierra Leone, 2008 - 2017
Get Microdata
Reference ID
SLE_2009-2017_ES-P_v01_M
Producer(s)
The World Bank
Metadata
DDI/XML JSON
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
5658
Downloads
400
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Sierra
    Leone_2009_2017

Cost For Establishment to Re-Purchase All of Its Machinery (n7a)

Data file: Sierra Leone_2009_2017

Overview

Valid: 77
Invalid: 225
Type: Discrete
Decimal: 0
Start: 2170
End: 2179
Width: 10
Range: -
Format:

Questions and instructions

Literal question
Hypothetically, if this establishment were to purchase the assets it uses now, in their current condition and regardless of whether the establishment owns them or not, how much would they cost, independently of whether they are owned, rented or leased- Machinery, vehicles, and equipment.
Categories
Value Category
-9 Don't know (spontaneous)
0
14
300
100000
150000
300000
400000
500000
1000000
1200000
1500000
2000000
3500000
4000000
6000000
7000000
7500000
8000000
10000000
12000000
12500000
13000000
15000000
16000000
18000000
20000000
25000000
30000000
35000000
38000000
40000000
45000000
46000000
50000000
55000000
60000000
70000000
78000000
80000000
85000000
100000000
150000000
180000000
190000000
250000000
358000000
500000000
520000000
800000000
2500000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.