IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ECU_2003-2017_ES-P_V01_M / variable [F4]
central

Enterprise Survey 2003-2006-2010-2017

Ecuador, 2003 - 2017
Get Microdata
Reference ID
ECU_2003-2017_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Sep 19, 2018
Last modified
Sep 19, 2018
Page views
17026
Downloads
79
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Ecuador_2003_2006_2010_2017

Cost of KWn from grid LCUs (_2003_s053)

Data file: Ecuador_2003_2006_2010_2017

Overview

Valid: 282
Invalid: 1556
Type: Discrete
Decimal: 0
Start: 3458
End: 3461
Width: 4
Range: -
Format:

Questions and instructions

Literal question
¿Cual es el costo promedio por kilowatt-hora (Kwh.) de la electricidad que compra de la red pública?
Categories
Value Category
-999 no responde
-777 No Aplica
-666 no sabe
0.00600000005215406
0.00999999977648258
0.0500000007450581
0.05799999833107
0.0599999986588955
0.0700000002980232
0.0719999969005585
0.0799999982118607
0.0810000002384186
0.0900000035762787
0.0939999967813492
0.100000001490116
0.109999999403954
0.119999997317791
0.129999995231628
0.140000000596046
0.150000005960464
0.159999996423721
0.170000001788139
0.200000002980232
0.209999993443489
0.219999998807907
0.25
0.270000010728836
0.310000002384186
0.319999992847443
0.349999994039536
0.360000014305115
0.439999997615814
0.550000011920929
0.5799999833107
0.689999997615814
0.740000009536743
0.800000011920929
0.819999992847443
0.889999985694885
0.939999997615814
0.959999978542328
2.29999995231628
5
6
11
13
23
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.