IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TJK_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Tajikistan, 2013 - 2014
Get Microdata
Reference ID
TJK_2013_ES_v01_M
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website
Created on
Oct 10, 2017
Last modified
Oct 10, 2017
Page views
8739
Downloads
786
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • tajikistan_2013_full_data

Annual losses due to power outages (LCU) (c9b)

Data file: tajikistan_2013_full_data

Overview

Valid: 10
Invalid: 349
Type: Discrete
Decimal: 0
Start: 225
End: 230
Width: 6
Range: -
Format:

Questions and instructions

Literal question
Please estimate the losses that resulted from power outages either as a percentage of total annual sales or as total annual losses.
Annual losses due to power outages
Categories
Value Category
-9 Don't know
-8 Refusal
-7 Does not apply
700
1000
2000
2500
3500
15000
150000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Losses because of power outages: The Manager should estimate the amount of production lost because of power outages.
Question post text
PROVIDE EITHER ONE OR THE OTHER, NOT BOTH c9a or c9b
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.