IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / PAN_2006_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2006

Panama, 2006
Get Microdata
Reference ID
PAN_2006_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
17304
Downloads
1243
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Panama-2006--full
    data-

total annual costs of water in last fiscal year (n2h)

Data file: Panama-2006--full data-

Overview

Valid: 240
Invalid: 364
Type: Discrete
Decimal: 0
Start: 1017
End: 1022
Width: 6
Range: -
Format:

Questions and instructions

Literal question
For fiscal year 2005, please provide the following information about this establishment:
Total annual costs of water
Categories
Value Category
-9 don't know
-8
0
12
40
120
138
144
168
169
180
197
200
204
209
230
240
275
294
300
325
330
348
360
380
420
432
480
492
500
504
540
545
558
600
624
650
660
672
696
700
720
740
800
840
850
900
960
1000
1020
1032
1033
1037
1044
1200
1300
1320
1440
1500
1524
1560
1600
1620
1665
1745
1800
1920
2000
2052
2100
2160
2200
2400
2500
2520
2700
2800
3000
3600
3970
4000
4200
4560
4800
5000
5820
5900
6000
7000
8130
9000
10000
12000
14000
15000
16000
18000
24000
25000
35000
36000
60000
130000
170000
180000
540000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.