IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / SLV_2006-2016_ES-P_V01_M / variable [F5]
central

Enterprise Survey 2006-2010-2016

El Salvador, 2006 - 2016
Get Microdata
Reference ID
SLV_2006-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
16329
Downloads
1526
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • ElSalvador_2006_2010_2016

Hypothetical cost to purchase its own land and buildings (Ln7a)

Data file: ElSalvador_2006_2010_2016

Overview

Valid: 437
Invalid: 1335
Minimum: -9
Maximum: 300000000
Type: Continuous
Decimal: 0
Start: 3692
End: 3700
Width: 9
Range: -
Format:

Questions and instructions

Literal question
If this establishment had to hypothetically purchase its own land and buildings, and machinery and equipment in use now, as they are in their current condition, how much would it cost to purchase each of the following?
Machinery and equipment (including vehicles)
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.