IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LSO_2009-2016_ES-P_V01_M / variable [F4]
central

Enterprise Survey 2009-2016

Lesotho, 2008 - 2016
Get Microdata
Reference ID
LSO_2009-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
9800
Downloads
551
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Lesotho_2009_2016

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Lesotho_2009_2016

Overview

Valid: 55
Invalid: 246
Type: Discrete
Decimal: 0
Start: 403
End: 404
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One minute or less
2
3
4
5
7
14
15
21
30
31
60
90
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.