IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BEN_2004-2016_ES-P_V01_M / variable [F3]
central

Enterprise Survey 2004-2009-2016

Benin, 2004 - 2016
Get Microdata
Reference ID
BEN_2004-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
28100
Downloads
1402
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Benin_2004_2009_2016

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Benin_2004_2009_2016

Overview

Valid: 341
Invalid: 156
Type: Discrete
Decimal: 0
Start: 242
End: 243
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Over fiscal year 2008, did this establishment experience insufficient water supply for production?
Categories
Value Category
-9 Don't know (spontaneous)
-7 Does not apply
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.