IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BEN_2004-2016_ES-P_V01_M / variable [F3]
central

Enterprise Survey 2004-2009-2016

Benin, 2004 - 2016
Get Microdata
Reference ID
BEN_2004-2016_ES-P_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
28603
Downloads
1402
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Benin_2004_2009_2016

cost of replacing machinery and equipment with new (afn7c)

Data file: Benin_2004_2009_2016

Overview

Valid: 74
Invalid: 423
Minimum: -9
Maximum: 40000000000
Type: Continuous
Decimal: 0
Start: 2074
End: 2084
Width: 11
Range: -
Format:

Questions and instructions

Literal question
In fiscal year 2008, what would be the cost of replacing all this establishment's machinery and equipment with new machines and equipment?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.