IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MDA_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Moldova, 2008 - 2009
Get Microdata
Reference ID
MDA_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
16773
Downloads
1183
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Moldova-2009--full
    data-

total annual costs of water in last fiscal year (n2h)

Data file: Moldova-2009--full data-

Overview

Valid: 110
Invalid: 253
Type: Discrete
Decimal: 0
Start: 952
End: 957
Width: 6
Range: -
Format:

Questions and instructions

Literal question
For fiscal year 2007, please provide the following information about this establishment:
Total annual costs of water
Categories
Value Category
-9 don't know
0
100
215
220
255
347
500
616
650
800
1000
1014
1195
1200
1400
1700
1800
1895
2000
2328
2448
2500
3000
3600
4400
4665
4960
5000
5400
6000
6550
6734
7000
7423
7609
7625
8000
8600
8758
9000
10000
11000
11700
13000
15000
21790
22000
22085
22100
24000
27358
29474
30000
35000
36000
36911
37000
40000
44000
49000
53000
57000
60000
68171
70000
97000
107000
120000
148000
150000
160000
189000
190000
192000
202891
203163
208918
240000
244000
357409
500000
940000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.