| Value |
Category |
| BUMG (2010) |
|
| BUMG(PRASARANA) |
|
| MCK (2011)/ MUSHALLA NUR-HUDA DUSUN NELAYAN |
|
| PEMBANGUNAN TALUT JALAN DERMAGA/LANJUTAN (2010) |
|
| PEMBUKAAN JALAN BARU (2011) |
|
| PEMBUKAAN JALAN BARU, PENGERASAN TALUT JALAN (2012) |
|
| PENGERASAN JALAN (2013) SEBELAH BARAT KAMPUNG DUSUN 2 +/- 200 METER |
|
| PENIMBUNAN JALAN BARU (2013) |
|
| PLAT BETON (2012) |
|
| RABAT BETON (2011) |
|
| RABAT BETON (2012) |
|
| RABAT BETON 2011 |
|
| SALURAN AIR/SPAL |
|
| SALURAN IRIGASI (2013) |
|
| SPP |
|
| SPP (2010) MODAL USAHA TANAMAN CABE |
|
| SPP (2012) |
|
| SPP (PINJAMAN MODAL USAHA) |
|
| TERATAK (2011), UNTUK ACARA ADAT |
|
| TPT/SALURAN |
|
| W |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.