| Value |
Category |
| BUMG/SPP PERTANIAN (2010) |
|
| BUMK (PENGADAAN MESIN PERONTOK PADI (2 UNIT) DAN MESIN KIPAS (1 UNIT) |
|
| GEDUNG TPA 2009/2010 |
|
| MCK (2008), SEBELAH TIMUR MASJID BABURRAHMAN +/- 5 METER |
|
| PEMBANGUNAN BENDUNGAN (2009) SEBELAH TIMUR KAMPUNG DUSUN 1 +/- 400 MET |
|
| PEMBANGUNAN JALAN JEMBATAN (2012) |
|
| PEMBUATAN BODI JALAN (JALAN BARU) |
|
| PEMBUKAAN JALAN (2009) |
|
| PEMBUKAAN JALAN ARAH TIMUR POSKESDES |
|
| PEMBUKAAN JALAN BARU 2009 |
|
| PENGERASAN JALAN (2010) |
|
| PENGERASAN JALAN (2011) |
|
| RABAT BETON |
|
| RABAT BETON (2011), SEBELAH BARAT MESJID DUSUN BEMONG +/- 35 M |
|
| SALURAN BETON (2011) |
|
| SALURAN IRIGASI (2012) |
|
| SALURAN IRIGASI 2012 |
|
| SALURAN IRIGASI(2011) |
|
| SALURAN PEMBUANG DAN TALUD 2009 |
|
| SALURAN PEMBUANGAN(2010) |
|
| SALURAN/SPAL |
|
| SARANA AIR BERSIH |
|
| SPP |
|
| SPP (2008) |
|
| SPP (2010) |
|
| SPP (2011) |
|
| SPP (2012) |
|
| SPP (PINJAMAN MODAL USAHA) |
|
| SPP BKPG (2008-2013) |
|
| TALUD JALAN(2009) |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.