IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / TUN_2013_ES_V02_M / variable [F2]
central

Enterprise Survey 2013

Tunisia, 2013 - 2014
Get Microdata
Reference ID
TUN_2013_ES_v02_M
Producer(s)
World Bank, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Created on
Jul 07, 2015
Last modified
Mar 29, 2019
Page views
19872
Downloads
1419
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • tunisia_2013_full_data

Informal Gift/Payment Expected Or Requested For A Construction-Related Permit (g4)

Data file: tunisia_2013_full_data

Overview

Valid: 72
Invalid: 520
Type: Discrete
Decimal: 0
Start: 582
End: 583
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, was an informal gift or payment expected or requested?
Categories
Value Category
-9 Don't know (SPONTANEOUS)
-8 REFUSAL (SPONTANEOUS)
1 Yes
2 No
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for construction permit. Self-explanatory
2) Sensitive question, no clarification can be offered
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.