IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / LSO_2011_MCC-ES_V01_M / variable [F1]
central

Enterprise Survey 2011

Lesotho, 2011
Get Microdata
Reference ID
LSO_2011_MCC-ES_v01_M
Producer(s)
National University of Lesotho,
Metadata
DDI/XML JSON
Created on
Jul 07, 2015
Last modified
Mar 29, 2019
Page views
11283
Downloads
440
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Enterprise
    Survey Round I

How long did it take the enterprise to be connected to water provided by WASCO f (c2_3)

Data file: Enterprise Survey Round I

Overview

Valid: 679
Invalid: 0
Type: Discrete
Decimal: 0
Start: 181
End: 185
Width: 5
Range: -
Format:

Questions and instructions

Categories
Value Category
-9999 Dont know
-8888 Not applicable
-6666 Missing
1 Less than a week
2 Between one week and one month
3 Between one month and six months
4 Between six months and one year
5 Longer than one year
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
How long did it take the enterprise to be connected to water provided by WASCO from the day it applied?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.