IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BDI_2014_ES_V01_M / variable [F1]
central

Enterprise Survey 2014

Burundi, 2014 - 2015
Get Microdata
Reference ID
BDI_2014_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Jul 07, 2015
Last modified
Mar 29, 2019
Page views
15315
Downloads
4690
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Burundi-2014-full
    data

Average Length Of Water Shortages (Affecting Production) In Last Fiscal Year (c17)

Data file: Burundi-2014-full data

Overview

Valid: 13
Invalid: 144
Type: Discrete
Decimal: 0
Start: 239
End: 240
Width: 2
Range: -
Format:

Questions and instructions

Literal question
How long did these incidents of insufficient water supply last on average?
Categories
Value Category
-9 DK
1 Less than one hour
2
3
4
5
6
7
8
12
15
16
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Duration of a water shortage can be estimated by considering the average duration of water insufficiencies that took place in a typical month.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.