IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / HND_2006_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2006

Honduras, 2006
Get Microdata
Reference ID
HND_2006_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
15117
Downloads
951
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Honduras-2006--full
    data-1

total annual costs of water in last fiscal year (n2h)

Data file: Honduras-2006--full data-1

Overview

Valid: 260
Invalid: 176
Type: Discrete
Decimal: 0
Start: 1154
End: 1160
Width: 7
Range: -
Format:

Questions and instructions

Literal question
For fiscal year 2005, please provide the following information about this establishment:
Total annual costs of water
Categories
Value Category
-9 don't know
-8
0
240
300
350
360
400
420
450
480
500
600
650
700
720
864
900
1000
1026
1050
1152
1200
1440
1500
1680
1800
2000
2094
2400
2500
2652
3000
3500
3600
3888
4000
4198
4800
5000
5400
5580
5600
6000
6111
6500
6600
7000
7200
7709
8000
8112
8241
8500
9000
9200
9600
10000
10800
12000
12498
14248
15000
15600
16654
17124
17617
18000
18700
19200
20000
21600
22000
24000
27600
30000
36000
40000
48000
50000
60000
80000
92000
94241
96000
97000
120000
130000
132000
140000
150000
185000
254955
325000
600000
1000000
1270000
1720000
2000000
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Total cost of labor, including wages, salaries and benefits is the total annual wages and all annual benefits, including food, transport, social security (i.e. pensions, medical insurance, and unemployment insurance).

Raw materials and intermediate goods (M) is the cost of all inputs in the production activity. This is usually an item directly taken from the financial statements

Total annual cost of finished goods and materials purchased to resell: (S) is the cost of all finished goods and materials purchased to be resold.

Fuel (M) is the total annual cost of all fuels consumed for heat, power, transportation, or the generation of electricity. Do not include the estimated costs of fuels, such as sawdust or blast furnace gas, produced as a byproduct of your manufacturing activities. Include anthracite and bituminous coal, coke, natural and manufactured gas, fuel oil, liquefied petroleum gas, gasoline, and all other fuels, including purchased steam. Be sure to include fuel used to power delivery trucks, fork lifts, or other motor vehicles associated with the establishment.

Electricity is the total annual cost of electric energy purchased from public or private utility companies or received from other establishments that belong to the same firm. Exclude the value of electricity generated and used at this establishment.

Total annual depreciation is the amortization of fixed assets due to the wearing down and/or obsolescence
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.