IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / GIN_2006_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2006

Guinea, 2006
Get Microdata
Reference ID
GIN_2006_ES_v01_M_WB
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
55314
Downloads
703
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Guinea2006_manufacturing_clean
  • Guinea2006_retail_and_it_clean
  • Guineabissau2006_residual_clean

Comments (comments)

Data file: Guinea2006_manufacturing_clean

Overview

Valid: 7
Invalid: 0
Type: Discrete
Start: 2236
End: 2315
Width: 80
Format:

Questions and instructions

Question pretext
COMPLETE THE FOLLOWING QUESTIONS AFTER THE INTERVIEW HAS BEEN COMPLETED
Interviewer comments
Categories
Value Category
cout de lelectricite englobe le cout du generateur ( gazoil)
g1 pas de connexion a l'électricité
impot payer est forfaitaire, payé sur la base du chiffre d'affaire déclaré
le cout de l'electricite est calculé selon la consommation du générateur en gazo
les chiffres concernant le chiffre d'affaires et les cout des matieres premieres
les frais de personnel c'est juste pour les maitres qui sont au nombre de 8 pas
les repondants declarent ne pas connaitre les lois de leur secteur
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.