IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / UGA_2011_UNPS_V01_M / variable [F63]
central

National Panel Survey 2011-2012

Uganda, 2011 - 2012
Get Microdata
Reference ID
UGA_2011_UNPS_v01_M
Producer(s)
Uganda Bureau of Statistics (UBOS)
Metadata
DDI/XML JSON
Study website
Created on
Dec 23, 2014
Last modified
Mar 29, 2019
Page views
204720
Downloads
4133
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • AGSEC1
  • AGSEC3A
  • AGSEC3B
  • AGSEC4A
  • AGSEC4B
  • AGSEC5A
  • AGSEC5B
  • AGSEC6A
  • AGSEC6B
  • AGSEC6C
  • AGSEC7A
  • AGSEC7B
  • AGSEC8A
  • AGSEC8B
  • AGSEC8C
  • AGSEC8D
  • AGSEC8E
  • AGSEC9
  • AGSEC10
  • CSEC1
  • CSEC2a
  • CSEC2b
  • CSEC2c
  • CSEC2c_1
  • CSEC3_1
  • CSEC3a
  • CSEC3b
  • CSEC3c
  • CSEC3d
  • CSEC3e
  • CSEC3f
  • CSEC3g
  • CSEC3h
  • CSEC3i
  • CSEC3j
  • CSEC3k
  • CSEC3L
  • CSEC3m
  • CSEC4ab
  • CSEC4c
  • CSEC4d
  • CSEC4e
  • CSEC4f
  • CSEC4g
  • CSEC4h
  • CSEC4i
  • CSEC4j
  • CSEC4k
  • CSEC4l
  • CSEC4m
  • CSEC4n
  • CSEC4o
  • CSEC4p
  • CSEC4p_B
  • CSEC4q
  • CSEC4r
  • CSEC5_1
  • CSEC5a
  • CSEC5b
  • CSEC5c
  • CSEC5d
  • CSEC5e
  • CSEC6a
  • CSEC6b
  • CSEC6c
  • CSEC6d
  • CSEC6e
  • GSEC1
  • GSEC2
  • GSEC3
  • GSEC4
  • GSEC5
  • GSEC6A
  • GSEC6B
  • GSEC6C
  • GSEC8
  • GSEC9A
  • GSEC9B
  • GSEC10A
  • GSEC10B
  • GSEC10C
  • GSEC11
  • GSEC12
  • GSEC14
  • GSEC15B
  • GSEC15BB
  • GSEC15C
  • GSEC15D
  • GSEC16
  • GSEC17A
  • GSEC17B
  • GSEC17C
  • GSEC18
  • GSEC18A
  • GSEC18B
  • UNPS_Geovars_1112
  • WSEC2A
  • WSEC2B_1
  • WSEC2B_2
  • UNPS 2011-12
    Consumption
    Aggregate
  • HH_SEC10_2
  • AGSEC2A
  • AGSEC2B

Other constraints faced by this sub-county in terms if maintenance and repair of (cd5q21_other)

Data file: CSEC5d

Overview

Valid: 85
Invalid: 0
Type: Discrete
Start: 30
End: 90
Width: 61
Format:

Questions and instructions

Categories
Value Category
BAD WEATHER
BAD WEATHER
BAD TERRAIN
BAD WEATHER
DELAY BY PFOCUREMENT PROCESS
DELAY IN PROCEREMENT AND TENDERING PROCESS
DELAY IN PROCUREMENT PROCESS
DELAY IN PROCUREMENT PROCESS
DELAY IN PROCUREMENT PROCESS
DELAY IN TENDERING AND PROCUREMENT PROCESS
DELAY BY CONTRACTORS
DELAY IN PROCUREMENT PROCESS
INADEQUATE ROAD EQUIPMENTS
LACK OF TECHNICAL PEOPLE
LACK OF LOCAL REVUNUE
LACK OF TECHNICAL SUPPORT
LONG TENDERING PROCESS
LUCK OF EQUIPMENT
LUCK OF STAFF ACCOMODATIONS
MOUNTANEOS TERRAIN
NATURE OF SOIL
NO -EQUIPMENTS
POLITICAL INFLUENCE
POLITICAL INTERFERENCE
POLITICAL INTREFERNCE
POOR WORK BY CONTRACTORS
POOR AWARD OF CONRACTS BY THE DISTRICT LEADING TO SHOODY WORK
POOR QUALITY WORK BY THE CONTRACTORS
POOR TENDERING SYSTEM
POOR WORK DONE BY CONTRACTORS
POOR WORKMANSHIP
PPDA(procurement) process takes verl long
PROCUREMENT UNIT DELAYS IN ISSUING CONTRACT WORKS
RELOCATION OF UTILITY SERVICES
ROAD RESERVE ENCHROCHMENT
SODDY WORK BY CONTRACTORS
SODDY WORK DONE BY CONTRACTORS
SUB -COUNTY DOESN,T HAVE SAY ON CONTRACTORS
SUB-COUNTY DOESN,T HAVE ACCESS TO PROCUREMENT PROCESS
TERRAIN
THE TYPE OF SOILS IN THE AREA
UNPREDICTABLE WEATHER
bad terrain and no good machinery
bad weather
bad weather and terrain
contractors use alot of money
delay by contractors
delay in procurement
distirct has no road unit so hinders works within
district conceal much information on road
extreme weather conditions
heavy rains damage roads
high cost of compensiating land owners
inadequate local revenue sources
incompetent road contractors
labour is expensive
lackof technical support
no response from district
poor terrain
private sector is expensive
tendering system that's not timely and not good
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.