IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / JOR_2013_ES_V02_M / variable [F4]
central

Enterprise Survey 2013

Jordan, 2013 - 2014
Get Microdata
Reference ID
JOR_2013_ES_v02_M
Producer(s)
World Bank, European Bank for Reconstruction and Development, European Investment Bank
Metadata
DDI/XML JSON
Study website
Created on
Dec 22, 2014
Last modified
Mar 29, 2019
Page views
17313
Downloads
1153
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • jordan_2013_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: jordan_2013_full_data

Overview

Valid: 20
Invalid: 553
Type: Discrete
Decimal: 0
Start: 280
End: 281
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 Don't know (SPONTANEOUS)
-6 STILL IN PROCESS
-5 APPLICATION DENIED
1 LESS THAN ONE DAY
5
7
10
14
15
20
21
30
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.