| Value |
Category |
| (CEMENT FLOOR) |
|
| (CLEAR COMPOUND WEEDS) |
|
| ADD MORE TO ROOF LEAFE |
|
| ADDED A PORCH |
|
| ADDING A RAFFIA TO ROOF |
|
| ADDING THATCH TO ROOF |
|
| ADDITIOJNAL PORCH |
|
| BLOCK |
|
| BLOCKS |
|
| BLOCKS SAND |
|
| BOUGHT BUILDING MATERIALS |
|
| BOUGHT SAND TO START A NEW HOUSING PROJECT |
|
| BRICKS |
|
| BUILD A NEW HOUSE |
|
| BUILD A NEW STRUCTURE |
|
| BUILD FOUNDATION |
|
| BUILDING A HOUSE |
|
| BUILDING A NEW HOUSE |
|
| BUILDING NEW BATHROOM |
|
| BUILDING OF A HOUSE |
|
| BUILT A NEW HOUSE |
|
| BUILT A PORCH |
|
| BUILT URINAL PIT |
|
| CARPET |
|
| CEALING |
|
| CEMENT |
|
| CEMENT AND LABOUR |
|
| CEMENT DWELLING FLOOR |
|
| CEMENT/LABOUR |
|
| CEMENT/LABOUR/FIXED DOOR LOCK |
|
| CEMENT/THATCH/LABOUR |
|
| CEMENTED DWELLING FLOOR |
|
| CEMENTED FLOOR |
|
| CEMENTED ROOM FLOOR |
|
| CEMENTED THE FLOORS |
|
| CHANGE DOOR LOCK |
|
| CHANGE DOOR LOCKS |
|
| CHANGE LOCK |
|
| CHANGE OF LOCK |
|
| CHANGED DOOR LOCK |
|
| CHANGED DOOR LOCKS |
|
| CHANGED LOCK |
|
| CHANGED LOCKS |
|
| CHANGED MY LOCKS |
|
| CHANGED NETS |
|
| CHANGING TROUGH |
|
| COMPLETION OF ABUNDANT BUILDING |
|
| CONCRETE |
|
| CONCRETE WORK |
|
| CONCRETE WORKS |
|
| CONSTRUCTION OF TOILET |
|
| CONTRIBUTED TO BUILD CURRENT PLACE OF RESIDENCE |
|
| DIGGING OF WELL |
|
| DOOR GATE |
|
| DOOR LOCK |
|
| DOOR LOCKS |
|
| DRAINAGE |
|
| ELECTRICAL FAULT |
|
| EXTENSION OF BATHROOM |
|
| FILLING OF COMPOUND |
|
| FIX TILES |
|
| FIXED A TRAP DOOR |
|
| FIXED FLOOR TILES |
|
| FIXED PILLAR |
|
| FIXED TILES |
|
| FIXING NET |
|
| FLOOR |
|
| FOUNDATION |
|
| GENERAL MAIN |
|
| GENERAL MAINTAIN |
|
| GENERAL REPAIRS |
|
| HUTS |
|
| INSTALLATION OF RAFFIA TO ROOF |
|
| INSTALLED WATER PIPE-BORNE METERED |
|
| INTERIOR DECOR |
|
| IRON RODS |
|
| IRON STAND |
|
| KITCHEN |
|
| KITCHEN STRUCTURES |
|
| LABOUR |
|
| LABOUR CHARGE |
|
| LABOUR COST |
|
| LABOUR/CEMENT |
|
| LABOUR/MAILS |
|
| LABOUR/WOOD |
|
| LABOURER |
|
| LABOUT COST |
|
| LOCAL PAINTING |
|
| LOCKS |
|
| MAEN REPAIR |
|
| MAINTENANCE |
|
| MAKING OF BLOCKS |
|
| METAL PILLARS |
|
| METAL POLES NEW KEY HOLDERS |
|
| MINOR CEMENT REPAIRS |
|
| MINOR MAINTANANCE |
|
| MINOR REPAIR |
|
| MINOR REPAIRS |
|
| MINOR REPAIRS T THE DWELLING |
|
| MINOR REPAIRS TO DWELLING |
|
| MINOR WORKS ON THE BATHROOM |
|
| MOULD BLOCK |
|
| MOULDING OF BLOCKS |
|
| MUD BRICKS |
|
| NAILS |
|
| NET |
|
| NEW BUILDING |
|
| NEW HOUSE |
|
| NEW HSE |
|
| NOW DEVELOPING IT |
|
| NOW STARTED NEW BUILDING PROJECT |
|
| OBSERVED A CRACK IN THE WALL OF THE BUILDING |
|
| OTHER (SPECIFY) |
|
| OTHER BUILDING |
|
| OTHER MINOR REPAIRS |
|
| OTHERS |
|
| PADLOCK |
|
| PADLOCKS |
|
| PATICHING |
|
| PLASTERING |
|
| PLOT |
|
| PLYWOOD |
|
| PLYWOOD ISED FOR EXTENSION FOR ROOM |
|
| PORCH |
|
| PURCHARES OF NAILS |
|
| PUTTING UP A NEW HOUSE |
|
| RAP DOORS |
|
| RE-INFORCEMENT |
|
| REINFORCEMENT |
|
| RENOVATE |
|
| RENOVATING BATHROOM |
|
| REPAIR OF DOOR |
|
| REPLACE NET |
|
| REPLACING A RUSTED ROOF |
|
| REPLASTERED WITH CLAY MUD |
|
| RETIREMENT HOUSE |
|
| ROOF |
|
| ROOFING A NEW HOUSE |
|
| SAND CEMENT STONE |
|
| SCREADING |
|
| SCREEDING |
|
| SERVICING OF DOVELLING PIPE |
|
| STAIRS |
|
| START A BUILDING |
|
| STARTING A NEW BBUILDING PROJECT |
|
| STARTING A NEW BUILDING PROJECT |
|
| STARTING A NEW BULDING PROJECT |
|
| STARTING A NEW HOUSING PROJECT |
|
| STARTING A NEW PROJECT |
|
| STORES |
|
| TENT |
|
| THATCH |
|
| TILED THE FLOOR |
|
| TOILET |
|
| TOILET FACILITY |
|
| TOILET MAINTAENANCE |
|
| TOTAL COST FOR THE BUILDING |
|
| TRAP DOOR |
|
| VALANDA |
|
| VARANDA |
|
| WIRING |
|
| WOOD |
|
| WOODEN STRUCTURE |
|
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.