IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_1988_SAKERNAS_V01_M / variable [F1]
central

National Labor Force Survey 1988

Indonesia, 1988
Reference ID
IDN_1988_SAKERNAS_v01_M
Producer(s)
Subdirectorate of Manpower Statistics
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
9629
Downloads
1062
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • sakernas88

Total number of working hours of main job in the past one week (hrsmn_c)

Data file: sakernas88

Overview

Valid: 132604
Invalid: 102017
Minimum: 0
Maximum: 99
Type: Continuous
Decimal: 0
Start: 84
End: 85
Width: 2
Format:

Questions and instructions

Literal question
Total number of working hours of main job in the past one week:
Interviewer instructions
The filling method is the same with details 8 with stuffing of Details 12 less than or equal to Details 8, because in Details 12 asked only the number of hours of the main job only, whereas in Details 8 covers all work (including additional job).

Description

Definition
Number of working hours is the period (in hours) used to work of the main job done during the past one week. Counting starts from one day ago (day 7th), two days ago (day 6th) and so on until seven days ago (day 1st), then add the working hours. If respondent temporarily does not work, fill in the numbers 00.
Universe
Household members aged 10 years and over who are employed or temporarily not working
Back to Catalog
IHSN Survey Catalog

© 2025, IHSN Survey Catalog, All Rights Reserved.