IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_1997_SAKERNAS_V01_M / variable [F1]
central

National Labor Force Survey 1997

Indonesia, 1997
Reference ID
IDN_1997_SAKERNAS_v01_M
Producer(s)
Subdirectorate of Manpower Statistics
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
8464
Downloads
868
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • sakernas97

Total work hours from the main job in the past one week (b4p8)

Data file: sakernas97

Overview

Valid: 121541
Invalid: 97898
Minimum: 0
Maximum: 99
Type: Continuous
Decimal: 0
Start: 50
End: 51
Width: 2
Range: -
Format:

Questions and instructions

Literal question
Total work hours from the main job in the past one week:
____ hours
Interviewer instructions
Write down the working hours of the main job during the previous week. The method to calculate the working hours during the past one week is the same with the method to calculate the working hours for the whole work in Detail 6. Remember, the working hours of the main job must be less or equal to the working hours of all works performed during the past one week.

Description

Definition
Total working hours for the main job in a week: refer to the total hours used by an employee for his/her main job during a calendar week (excluding the time used for other activities which are not classified as "work")
Universe
Household members aged 10 years and over who are employed or temporarily not working
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.