IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / IDN_2011_SAKERNAS-FEB_V01_M / variable [F2]
central

National Labor Force Survey 2011

Indonesia, 2011
Reference ID
IDN_2011_SAKERNAS-FEB_v01_M
Producer(s)
Subdirectorate of Manpower Statistics
Metadata
DDI/XML JSON
Study website
Created on
Sep 05, 2014
Last modified
Mar 29, 2019
Page views
12563
Downloads
889
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • sakernas11feb

Total number of hours worked for the main job in the past one week (b5p11)

Data file: sakernas11feb

Overview

Valid: 88572
Invalid: 45029
Minimum: 0
Maximum: 98
Type: Continuous
Decimal: 0
Start: 32
End: 33
Width: 2
Range: -
Format:

Questions and instructions

Question pretext
Q8 to Q17 are just for household member who are employed (Q2a.1 = 1 or Q3 = 1)
Literal question
What is (NAME) total number of hours worked of a main job in the past one week? .......... Hours
Interviewer instructions
Write down the working hours of the main job during the previous week. The method to calculate the working hours during the previous week is the same with the method to calculate the working hours for the whole work in Detail 8.b. Remember, the working hours of the main job must be less or equal to the working hours for the whole work performed during the previous week.

Description

Definition
Total working hours for the main job in a week: refer to the total hours used by an employee for his/her main job during a calendar week (excluding the time used for other activities which are not classified as "work")
Universe
Household members aged 10 years and over who are employed or temporarily not working
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.