IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BIH_2009_ES_V01_M_WB / variable [F1]
central

Enterprise Survey 2009

Bosnia and Herzegovina, 2008 - 2009
Get Microdata
Reference ID
BIH_2009_ES_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Study website Interactive tools
Created on
Sep 29, 2011
Last modified
Mar 29, 2019
Page views
18549
Downloads
1550
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Bosnia and
    Herzegovina-2009--full
    data-

approx. collateral needed as % of the loan value \ value of the line of credit (k15)

Data file: Bosnia and Herzegovina-2009--full data-

Overview

Valid: 190
Invalid: 171
Type: Discrete
Decimal: 0
Start: 836
End: 838
Width: 3
Range: -
Format:

Questions and instructions

Literal question
Referring only to this most recent line of credit or loan, what was the approximate value of the collateral required as a percentage of the value of the loan or line of credit?
Categories
Value Category
-9 don't know
2
10
15
20
25
26
30
35
40
50
57
80
100
112
120
130
140
150
160
180
200
250
290
300
350
400
480
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Value of collateral - self explanatory
Question post text
INTERVIEWER: THE ANSWER COULD BE GREATER THAN 100%
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.